Day Eight   Back to Krenim.org
The original framing for the walls that were to make up the location for the fridge and a walk-in pantry.  The part of the plan was changed soon after this.

The original framing for the walls that were to make up the location for the fridge and a walk-in pantry. The part of the plan was changed soon after this.


Powered by Gallery v1.5.7