View of the new framing for the ceiling and the now electrified can lights.
View of the new framing for the ceiling and the now electrified can lights.
Viewed: 455 times.

Plumbing for the new sink on the west wall of the kitchen
Plumbing for the new sink on the west wall of the kitchen
Viewed: 417 times.

Electrical for wall outlets and dishwasher on the west wall of the kitchen.
Electrical for wall outlets and dishwasher on the west wall of the kitchen.
Viewed: 477 times.

Wall repair work on the south wall of the kitchen
Wall repair work on the south wall of the kitchen
Viewed: 449 times.

View of the framing work that will define the wall for the refridgerator and the walk-in pantry/closet behind
View of the framing work that will define the wall for the refridgerator and the walk-in pantry/closet behind
Viewed: 383 times.

Repair work to the north wall of the kitchen where we found the remains of two walls that had been removed by the previous owner
Repair work to the north wall of the kitchen where we found the remains of two walls that had been removed by the previous owner
Viewed: 377 times.

More repair work on the north wall of the kitchen.
More repair work on the north wall of the kitchen.
Viewed: 389 times.

Plumbing for the water supply for the ice maker in the refridgerator.
Plumbing for the water supply for the ice maker in the refridgerator.
Viewed: 377 times.

Framing for the door that was to be the entrance of the walk in pantry/closet.  This was changed very early on in the project.
Framing for the door that was to be the entrance of the walk in pantry/closet. This was changed very early on in the project. *
Viewed: 401 times.