Southwest corner and west wall of the kitchen with old floor removed down to the joists.
Viewed: 535 times.
|
Along the north wall of the kitchen, one joist had to be replaced due to old termite damage.
Viewed: 455 times.
|
Southeast corner of the kitchen with flooring removed down to the joists.
Viewed: 439 times.
|
View of work to replace one joist that had been eaten-up by termites years ago.
Viewed: 453 times.
|
Northeast corner of the kitchen with flooring removed to the joist and work to replace one joist that had been previously eaten-out by termites.
Viewed: 508 times.
|
Northeast corner of the kitchen showing the various paint outlines of previously removed construction.
Viewed: 428 times.
|
North wall of the kitchen showing evidence of previous walls that definded the previous pantry.
Viewed: 440 times.
|
View down behind the south wall of the basement of what used to be part of the finished basement.
Viewed: 448 times.
|
Northwest corner of the kitchen with the old flooring removed down to the joists and work to replace one joist that had long ago been eaten-out by termites
Viewed: 443 times.
|
Northwest corner of the kitchen with the old flooring removed down to the joists and work to replace one joist that had long ago been eaten-out by termites
Viewed: 371 times.
|
Northeast corner of the kitchen with the old flooring removed down to the joists and work to replace one joist that had long ago been eaten-out by termites
Viewed: 353 times.
|
East wall of the kitchen with the old flooring removed down to the joists
Viewed: 366 times.
|