July 17, 2005    Back to Krenim.org
Drywall and area next to tub that will be covered with concrete backer board for tiling.
Drywall and area next to tub that will be covered with concrete backer board for tiling.
Viewed: 253 times.

New lavatory area with drywall completed
New lavatory area with drywall completed
Viewed: 211 times.

Drywall on southeast side of the bathroom.  Area without drywall will have concrete backer-board for tiling
Drywall on southeast side of the bathroom. Area without drywall will have concrete backer-board for tiling
Viewed: 199 times.

Lower southeast corner of bathroom.  Tub and some of the completed drywall.
Lower southeast corner of bathroom. Tub and some of the completed drywall.
Viewed: 184 times.

Compeleted drywall for the ceiling.  Square section is the new exhaust fan and the small circle is an electrical box for a pendant light.
Compeleted drywall for the ceiling. Square section is the new exhaust fan and the small circle is an electrical box for a pendant light.
Viewed: 198 times.

Southwest corner of bathroom with drywall completed.
Southwest corner of bathroom with drywall completed.
Viewed: 199 times.

Toilet drain, waterline for toilet and completed drywall on south wall of bathroom.
Toilet drain, waterline for toilet and completed drywall on south wall of bathroom.
Viewed: 196 times.

Northwest corner of the bathroom which is the new lavatory area.  Drywall complete with plumbing.
Northwest corner of the bathroom which is the new lavatory area. Drywall complete with plumbing.
Viewed: 197 times.

View of bathroom from the foyer.  Window will be replaced with glass brick window in the coming weeks.
View of bathroom from the foyer. Window will be replaced with glass brick window in the coming weeks.
Viewed: 208 times.

Powered by Gallery v1.5.7
Questions?: Jeff Groves Copyright 1999-2007 Jeffrey A. Groves