Drywall and area next to tub that will be covered with concrete backer board for tiling.
Viewed: 253 times.
|
New lavatory area with drywall completed
Viewed: 211 times.
|
Drywall on southeast side of the bathroom. Area without drywall will have concrete backer-board for tiling
Viewed: 199 times.
|
Lower southeast corner of bathroom. Tub and some of the completed drywall.
Viewed: 184 times.
|
Compeleted drywall for the ceiling. Square section is the new exhaust fan and the small circle is an electrical box for a pendant light.
Viewed: 198 times.
|
Southwest corner of bathroom with drywall completed.
Viewed: 199 times.
|
Toilet drain, waterline for toilet and completed drywall on south wall of bathroom.
Viewed: 196 times.
|
Northwest corner of the bathroom which is the new lavatory area. Drywall complete with plumbing.
Viewed: 197 times.
|
View of bathroom from the foyer. Window will be replaced with glass brick window in the coming weeks.
Viewed: 208 times.
|